Overview

Client - Dr Samson Looi

Dr Looi was looking to establish his first practice and approached Dentec to talk about his plans. 

Over a period of months Dentec worked closely with Dr Looi to explore various sites and locations. The most promising looked to be a newly developed site in the new and rapidly growing suburb of Milldale on Auckland's North Shore. Having narrowed the options to this site, the Dentec team worked up a concept plan and projected costings. Happy with how the space could be transformed and work within budget parameters, Dr Looi secured the site. 

Dentec progressed through the in-depth design stage and on to the full fitout of the project, proudly celebrating with Dr Looi and his team at the opening of the new Ora Dental in August 2026.

Commenting on the first weeks in his new practice, Dr Looi says “It’s been great. We’ve had compliments from patients saying how nice the place looks. It’s bright, it’s clean, which is what I wanted for my patients, so I’m happy.”

 

 

The Challenge

The project presented two key considerations.

The first was to find a site of the right size and location: A high growth area, with limited competition that sat within budget parameters and provided enough space to support a thriving practice.

The second consideration was to develop a fitout plan that made the most of every square metre, respected budget parameters and factored in future growth potential. This would help Ora Dental start strongly and be comfortably positioned to cater for extra capacity in the years ahead.



Ora Dental_Reception_1620x1080
Ora Dental - SurgeryHallway_1620x1080

The Solution

Site search

Site searching has become intrinsic to the services Dentec offers. The team has forged a strong network of agents and developers across the country and takes a keen interest in exploring potential sites and feasibility. When Dr Looi made contact, the team was in a strong position to provide help and guidance with the site search and feasibility until the right one was found.

Design

Understanding the practice vision and space and cost parameters, the design team produced a plan that maximised space and functionality, fitting a reception/waiting area, three treatment rooms, CBCT room, hygiene room, sterilisation room, staff room and plant room into the 113m².

Staged fitout strategy

Future flex was accommodated within current budget parameters by adopting a staged fitout strategy. Instead of fully completing and equipping every proposed treatment room from the outset, plumbing and services infrastructure were planned for in surgery spaces nominated for 'future' use, but not fully installed. This allows for the rooms to be cost effectively completed and equipped as the business grows and additional capacity becomes necessary. This staged approach reduced the initial capital investment without compromising the longer-term potential of the practice.

 

 

Ora Dental - Surgery_1620x1080

The Details

Spaces worked on

  • Reception/Waiting area

  • 3 treatment rooms

  • CBCT room

  • Hygiene room

  • Sterilisation room

  • Staffroom

  • Plant room

Dentec Services

  • Site selection

  • Concept planning

  • Interior design

  • Project management

  • Interior fitout construction

Scope of project

  • Plumbing & electrical

  • Data & Lighting

  • Carpentry

  • Dental services

  • Suspended ceilings

  • Underfloor trenching & flooring

  • Signage & Security

  • Joinery/glazing/frosting

  • Fire Services and Accessibility

 